James Cook High School required an upgrade to their gymnasium floor however, due to the sheer scale of the job, the cost of product was a major factor. Synergy was able to source a locally-supplied product that fell within the school’s budget without compromising on performance or design. Additionally, the special 6.7mm acousti-backed sports floor was specifically selected to reduce fallout from injury during students’ use of the gym floor.
The team at Synergy completed this large-scale, high-performance flooring project, complete with court markings for 7 different sports, during the school holiday period.